Sign In | Join Free | My chinacomputerparts.com
China Zhangjiagang Dehai Boiler Co., Ltd logo
Zhangjiagang Dehai Boiler Co., Ltd
High quality for survival and perfect service for development.
Active Member

7 Years

Home > Boiler Fin Tube >

Biomass Fuel Baseboard Heater Aluminum Fins Cooling Pipe Auxiliary Equipment Parts

Zhangjiagang Dehai Boiler Co., Ltd
Contact Now

Biomass Fuel Baseboard Heater Aluminum Fins Cooling Pipe Auxiliary Equipment Parts

  • 1
  • 2
  • 3

Brand Name : Dehai Boiler

Model Number : Fin tube

Certification : ISO9001 , SGS , ABS , ASME

Place of Origin : China

MOQ : 1 Set

Price : Negotiable

Payment Terms : L/C, T/T

Supply Ability : 800 Tons / Month

Delivery Time : 30 Days

Packaging Details : Seaworthy packing

Application : Heater, Cooler

Usage : Industrial

Heat Transfer Surface : Tubular Heat Exchanger

Type : Steel Heating Equipment

Style : Steel Type

Structure Material : Metal Material

Contact Now

Biomass Fuel Cooling Pipe Steam Boiler Auxiliary Equipment Parts Fin Tube for Power Plant Parts

Boiler Auxiliary Finned Tube Boiler Economizer

1. Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid.

2. Economizers are thus named as a result of they will utilize the total heat of the fluid flow is hot, however not hot enough to be employed in the boiler, so the total heat recovery is additional helpful and improve boiler potency.

3. They are a tool fitted to a boiler that saves energy by victimisation exhaust gas from the boiler to heat the cold water accustomed fill it.

Product Advantage

1. Add the heat exchange area and reduce the number of tubes, also increase the fume flow section area to reduce the fume speed and abrasion.
2. H type fin tube can be made to double H type fin tube, high rigidness to fit long tube row.
3. H type fin economizer arranged in line to make the space into many small zones, averaged air flow to reduce the abrasion.
4. With straight channel to gain the best ash-blowing effect.
5. The compact structure to reduce the weight and reduce the manufacturing cost.

Quality Control

1 Impact test and Strength calculation report with applied materials information.
2 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3 X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4 Hydraulic test report: ensure the standard working pressure and safety.

Technical Parameters

Name(unit) Specification(mm)
Bare pipe(OD) 25-300
Bare pipe(Thickness) 2-30
Fin (Thickness) 0.4-3.0
Fin (Height) 5-35
Fin tube thread pitch 5-35
Fin tube length ≤15000
After Painting
Biomass Fuel Baseboard Heater Aluminum Fins Cooling Pipe Auxiliary Equipment Parts


Product Tags:

fin tube radiator

      

finned radiator pipe

      
China Biomass Fuel Baseboard Heater Aluminum Fins Cooling Pipe Auxiliary Equipment Parts factory

Biomass Fuel Baseboard Heater Aluminum Fins Cooling Pipe Auxiliary Equipment Parts Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang Dehai Boiler Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)